Airport transformation provides a seamless experience and convenience for all travellers

The Perth Airport Terminal 1 Domestic Pier and International Departures Expansion project was the largest component of the airport's $1 billion redevelopment.

Built Environs project team navigated the complex airside construction works at an operational passenger airport, adhering to stringent airport security, occupational health, safety, and environmental requirements.

Domestic terminal area - 22 new domestic check-in desks, check-in kiosks, bag-drop technology, three Airbus A330-capable gates with two aerobridges each, four other aircraft gates, a shopping area with nine retail offerings, a new Virgin Australia lounge, and a baggage reclaim area with access to new taxi and parking facilities.

International departures area - 18 new international check-in desks, two Airbus A380-capable gates with two aerobridges each, three new airline lounges, and new and expanded retail offerings.

Fast Facts:

  • 22 new domestic check-in desks
  • Three Airbus A330-capable domestic gates, each with two aerobridges
  • Four additional domestic aircraft gates.
  • 18 new international check-in desks
  • Two Airbus A380-capable international gates